Stiffness: (english) This is a general term which may be applied to materials or structures. When a force is applied to a structure, there is a displacement in the direction of the force; stiffness is the ratio of the force divided by the displacement. High stiffness means that a large force produces a small displacement. When discussing the stiffness of a material, the concept is the same, except that stress substitutes for force, and strain substitutes for displacement; see modulus of elasticity.
Structural model: (english) An idealization for analysis purposes of a real or conceived structure. A structural model includes boundaries limiting the scope of the analysis. Supports occur at these boundaries, representing things which hold the structure in place.
Clarifier (sedimentation basin) (Environmental Engineering) A tank in which quiescent settling occurs, allowing solid particles suspended in the water to agglomerate and settle to the bottom of the tank. The solids resulting from the settling being removed as a sludge.
Composting (Environmental Engineering) The controlled aerobic degradation of organic wastes into a material which can be used for landscaping, landfill cover, or soil conditioning.
Discrete settling (Environmental Engineering) Settling in which individual particles settle independently, neither agglomerating or interfering with the settling of the other particles present. This occurs in waters with a low concentration of particles.
Effluent based standards (Environmental Engineering) Standards which set concentration or mass per time limits on the effluent being discharged to a receiving water.
Electronegativity (Environmental Engineering) The potential of an atom to attract electrons when the atom is bonded in a compound. The scale is 0 to 4 with 0 being the most electropositive (low attraction) and 4 being the most electronegative (high attraction).
Nonpoint source pollution (NPSP) (Environmental Engineering) Any pollution from a source which cannot be attributed to a particular discharge point, e.g. from agricultural crops, city streets, construction sites, etc.
NPDES (Environmental Engineering) The National Pollutant Discharge Elimination System. The discharge criteria and permitting system established by the U.S. EPA as a result of the Clean Water Act and its subsequent amendments or the permit required by each discharger as a result of the Clean Water Act.
Primary treatment (Environmental Engineering) Treatment which includes all operation prior to and including primary treatment, e.g., bar screening, grit removal, comminution, and primary sedimentation.
Browse Dictionary
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z