Hydrologic Cycle |
(Concrete Engineering) The Hydrologic Cycle consists of the evaporation of water from oceans and other bodies of open water; condensation to produce cloud formations; precipitation of rain, snow, sleet or hail upon land surfaces; dissipation of rain or melted solids by direct run-off into lakes and by seepage into the soil. Thereby producing a continuing endless source of water in the sub-grade. |
Impermeable |
(Concrete Engineering) The ability of a material or product to reduce or eliminate gaseous transmissions through it's mass; measured as the rate of Water Vapor Transmission (WVT). Note: Not all materials that are waterproof are vaporproof; all materials that are vaporproof are inherently waterproof. |
Keene's Cement |
(Concrete Engineering) A finely ground high density plaster composed of anhydrous, (calcined or "dead burned") gypsum, the set of which is accelerated by the addition of other materials. |
Kelly Ball |
(Concrete Engineering) A device for determining the consistency of fresh concrete. It is sometimes used as an alternative to the slump test. |
Magnetite |
(Concrete Engineering) An aggregate used in heavy weight concrete, consisting primarily of ferrous metaferrite (Fe304). A black magnetic iron ore with a specific gravity of approximately 5.2 and a Mohs hardness of about 6. |
Mass Curing |
(Concrete Engineering) Adiabatic curing, using sealed containers. |
Maximum Size Aggregate |
(Concrete Engineering) Aggregate whose largest particle size is present in sufficient quantity to affect the physical properties of concrete; generally designated by the sieve size on which the maximum amount permitted to be retained is 5 or 10 percent by weight. |
Mixing Speed |
(Concrete Engineering) Rate of mixer drum rotation or that of the paddles in a pan, open-top, or trough type mixer, when mixing a batch; expressed in revolutions per minute (rpm) or in peripheral] feet per minute of A point on the circumference at maximum diameter. |
Moist Room |
(Concrete Engineering) A room used for storing and curing cementitious test specimens. The atmosphere of this room is maintained at a temperature of 73.4 3.0'F or 23.0*1.7'0 and relative humidity of at least 98 percent. These facilities must be adequate to continually maintain free moisture on the exteriors of test specimens. |
Neat Cement |
(Concrete Engineering) Unhydrated hydraulic cement. |