Retempering (Concrete Engineering) The addition of water and remixing of concrete which has started to stiffen: usually not allowed as it may affect the ultimate strength.
Rod (tamping) (ASTM C24l) (Concrete Engineering) A round, straight steel rod, 5/8' in diameter and approximately 24' in length, having the tamping end rounded into a hemispherical tip, the diameter of which is 5/8'.
Sacking (Concrete Engineering) Removing or alleviating defects on a concrete surface by applying a mixture of sand and cement to the moistened surface and rubbing with a coarse material such as burlap.
Spall (Concrete Engineering) A fragment, usually of flaky shape, detached from a larger mass by pressure, expansion from within the larger mass, a blow, or by the action of weather.
Stucco (Concrete Engineering) A portland cement mortar material that can be applied to the surface of any building or structure to form a hard and durable covering for the exterior wails or other exterior surfaces.
Sulfate Attack (Concrete Engineering) Deleterious chemical and/or physical re-action between sulfates in ground water or soil and certain constituents in cement, which result in expansion and disruption of the concrete.
Sulfate Resistance (Concrete Engineering) Ability of cement paste, aggregate, or mixtures thereof to withstand sulfate attack.
Temper (Concrete Engineering) The addition of water to the cement mix whether at the batch plant, during transit or at the jobsite to achieve the specified water to cement ratio.
Transit-Mixed Concrete (Concrete Engineering) Concrete produced from a central-batching plant, where the materials are proportioned and placed in truck-mixers for mixing enroute to the job or after arrival there.
Truck Mixer (Concrete Engineering) A concrete mixer capable of mixing concrete in transit when mounted on a truck chassis.
Browse Dictionary
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z