Retempering |
(Concrete Engineering) The addition of water and remixing of concrete which has started to stiffen: usually not allowed as it may affect the ultimate strength. |
Rod (tamping) (ASTM C24l) |
(Concrete Engineering) A round, straight steel rod, 5/8' in diameter and approximately 24' in length, having the tamping end rounded into a hemispherical tip, the diameter of which is 5/8'. |
Sacking |
(Concrete Engineering) Removing or alleviating defects on a concrete surface by applying a mixture of sand and cement to the moistened surface and rubbing with a coarse material such as burlap. |
Spall |
(Concrete Engineering) A fragment, usually of flaky shape, detached from a larger mass by pressure, expansion from within the larger mass, a blow, or by the action of weather. |
Stucco |
(Concrete Engineering) A portland cement mortar material that can be applied to the surface of any building or structure to form a hard and durable covering for the exterior wails or other exterior surfaces. |
Sulfate Attack |
(Concrete Engineering) Deleterious chemical and/or physical re-action between sulfates in ground water or soil and certain constituents in cement, which result in expansion and disruption of the concrete. |
Sulfate Resistance |
(Concrete Engineering) Ability of cement paste, aggregate, or mixtures thereof to withstand sulfate attack. |
Temper |
(Concrete Engineering) The addition of water to the cement mix whether at the batch plant, during transit or at the jobsite to achieve the specified water to cement ratio. |
Transit-Mixed Concrete |
(Concrete Engineering) Concrete produced from a central-batching plant, where the materials are proportioned and placed in truck-mixers for mixing enroute to the job or after arrival there. |
Truck Mixer |
(Concrete Engineering) A concrete mixer capable of mixing concrete in transit when mounted on a truck chassis. |